Laserfiche WebLink
Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />July 2003 Monthly Report <br />Page 3 <br />Table 2 -July 2003 Tailing Disposal Area Piezometer Depth to Water <br />Measurements <br />Piezometer Date Depth to <br />Water feet Total Depth <br />ft Volume of <br />Water (ft <br />P6 7/31/03 D 72.46 0.00 <br />P7 7/31/03 Dr 92.50 0.00 <br />P8 7/31/03 96.92 97.51 0.59 <br />P9 7/31/03 71.68 72.30 0.62 <br />P10 7/31/03 57.41 58.30 0.89 <br />P11 7/31/03 41.12 41.80 0.68 <br />P12 7/31/03 Dry 41.71 0.00 <br />P13 7/31/03 41.07 41.34 0.27 <br />P14 7/31/03 Dr 41.24 0.00 <br />P15 7/31/03 Dry 41.10 0.00 <br />During July 2003, approximately 10 tons of water treatment plant sludge was transported <br />from the drying pad to the tailing facility. Table 3 below identifies water treatment plant <br />sludge management for calendar year 2003 to date. <br />Table 3 -Calendar Year 2003 Water Treatment Plant Sludge Management <br />Date Approximate Tonnage <br />Mona ed Sludge Disposition <br />March 12-15, 2003 670 Tailing Disposal Area <br />A ril ]7-]8, 2003 600 Dr in Pad <br />Ju1~5-26, 2003 10 Tailin Dis osal Area <br />Should you have any questions or comments, please do not hesitate to contact either Mr. <br />Julio Madrid (719) 379-0799 or myself (303) 324-2630 or (970) 325-4482. <br />Si erel <br />i e <br />Dir ctor of Env. Affairs <br />Cc: Julio Madrid <br />file <br />