Laserfiche WebLink
<br /> <br />shall be measured at the same locations for one <br />week per month. Methods and frequencies shall be <br />as referenced the Procedures Manual required by <br />LC 12.1.7. Air monitoring results shall be <br />reported semiannually to the Department. <br />12.4.11.2 47ater hbnitoring <br />Surface water monitoring shall beat least <br />monthly unless otherwise approved by the <br />Department and in accordance with Department <br />approved procedures. Water monitoring shall be <br />done on Ralston Creek at least at the following <br />points: <br />1. upstream of the mine waste piles <br />2. above discharge point downstream of the mine <br />waste piles <br />3. downstream at the cattle gate <br />4. Inng Lake head gate <br />The monitoring and interceptor system shall be <br />reviewed az~d evaluated annually for adequacy. <br />12.4.11.3 Soil Sampling <br />Soil samples shall betaken at yearly intervals <br />proximate to the air sampling locations. <br />12.4.11.4 Vegetation Sampling <br />Vegetation, forage, and crops shall be sampled <br />three times during each growing season at the <br />locations identified in the Procedures ZM1anual <br />required by LC 12.1.7. <br />12.4.11.5 Fauna Sampling <br />Sampling of fauna shall be done only in <br />accordance with a permit issued by the Colorado <br />Division of Wildlife arri.as approved by the <br />Department. <br />12.4.11.6 Semiannual Report <br />The results of these monitoring requirements <br />shall be included in the licensee's semiannual <br />environmental monitoring report to the Department. <br />,VII -20- <br />