Laserfiche WebLink
• RAG EMPIRE CORPORATION WASTE PILE INSPECTION FORM <br />PILE LD. NO. 121 I-CO-09-01370-O1 (SURFACE WASTE PILE) <br />PILE I.D. NO. 121 I-CO-09-01370-02 (OLD NO. 9 EXCAVATION) <br />INSPECTOR SIGNATURE: (.%eC~ly~,: ~,///~l <br />INSPECTOR TITLE: ~~ ~ ~. <br />Under the supe vision of Michael Ludlow, Colorado P.E. #24046 <br />This inspection was conducted to comply with DMG Rule 4.09.101). <br />This inspection was conducted to evaluate: <br />~ A. Stability of fill (quarterly inspection) <br />!~'~~ B. Critical construction periods: <br />_1. Removal of all organic materiaUtopsoil <br />2. Placement of underdrainage system <br />• _3. Installation of surface drainage system <br />4. Placement and compaction of fill materials <br />NOTES: <br />• file:I:tENtENVIR01 <br />,5. Revegetation <br />