Laserfiche WebLink
r ,. • III III III IIIIIIIIII ~ GenerGreeley 352.6574 <br />® Ft. Collins 484.0995 <br />Brighton 659-2614 <br />Ready Mixed Concrete <br />Greeley 352-8411 <br />MOBILE PREMIX ,INC. Ft. Collins 460-, 52, <br />eke Cowan Concrete aroaucta, Inc. Windsor 666-7769 <br />P.O. Box 1647 • 625 3rd Street, Greeley, Colorado 80632 • 303.352-6574 <br />August 27, 1981 <br />Mined Land Reclamation <br />1313 Sherman, Room 423 <br />Denver, CO 80203 <br />Gentlemen, <br />Re Annual Report, MLR File No. 77-36 <br />...~ <br />L ~'.~. ~.J ~i~~'I .1 -J L~II <br />AUG 2u 1981 <br />MiIVED LAND I?ECLE~,IViATI01V <br />Colo. Deft. of i~'3tural Reso~~rces <br />The Anniversary Date for the Greeley Pit is October 18, 1978. We <br />have not located any files to indicate that Annual Reports for <br />1979 and 1980 were submitted. This report will cover both those <br />years. A check for $700 to cover the fees for 1979 and 1980 is <br />enclosed. The 1981 Annual Report will be filed in a timely manner. <br />We will deal specifically, by number, with each of the Annual Report <br />questions as outlined in Section 2.41 of the Rules and Regulations. <br />2.41 (1) In Phases 1 and 2, 59.951 acres (the total area) was <br />stripped and partially mined. Approximately 15.921 acres <br />in Stages 3 and 5 are affected by the processing plant. <br />Some of the overburden from Stage 3 was used to created <br />approximately 2,100 feet of berm that was necessary to <br />keep the Cache La Poudre out of the mining area when <br />Weld County channelized the river along our north <br />property line. In addition, approximately 4.561 acres <br />was stripped in Stage 4 under emergency conditions to <br />create approximately 700 feet of berm along the north <br />bend in the river where unusual erosive action occurred <br />as a result of channelization. Soil from the stripped <br />area is stockpiled along the west side of Phases 1 and 2. <br />(2) No reclamation was called for at this time. However, an <br />area along the east side was resoiled and planted with a <br />cover of oats (see map enclosed). <br />(3) None required. <br />(4) thru (6) Not applicable. <br />(7) Extraction will continue in Phases 1 and 2 according to <br />the plan outlined in the Technical Revision submitted <br />and accepted in October 1979. <br />OO . ~ - <br />;. <br />- k <br />1100 RIVERSIDE - FT.COLLINS,CO80521 - 303-484-0995 • • B.>: <br />"ECOHOM Y'~(,~ Ready Mixed Concrete - Masonry Building Supplies ••sEavicE•• <br />