My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP36153
DRMS
>
Back File Migration
>
Report
>
REP36153
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:13:54 AM
Creation date
11/27/2007 7:21:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991035
IBM Index Class Name
Report
Doc Date
11/14/1997
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 112C CONSTRUCTION MATERIALS ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,e c, "~--bps <br />~ II I III I II 1111111 III ~.. ~~.-~ u~ ~3 <br />Notice of Intent to Continue Mining Operations R~~C_~ V C~ <br />112c Construction Materials Annual Report <br />Permittee Name: Western Acarecates Inc NUV ~ ~ 991 <br />Permit No. : M-91-035 <br />Operation Name: Conda/McKay <br />Anniversary Date: November OS, 1997 Uiv~SNi~u~~•~~~~e(d15&G80IOJyi <br />Total: $550.00 (Due on your Anniversary Date) `~ <br />1. a. Permitted acreage: ~ b. County where mine is located: J P~'p/7a n <br />2. Has this mine been granted TEMPORARY CESSATION STATUS? YES <br />Does this mine operate MORE or LESS than 180 days per year? M RE LESS <br />3. Does this mine have a phased reclamation plan? YES NO <br />4. Total acres affected during the report year:* a ~.~ <br />5. Total acres reclaimed for the report year:* y] e~ 3 <br />6. Total number of acres in topsoil replacement stage: ~•~ 3 <br />a. Average thickness of topsoil replaced: 7je <br />7. To.a1 number of acres seeded: ~•.~ 3 <br />a. List species seeded & seeding rate for report year on back <br />6. Fo:r non-phased operations provide dates extraction ceased: <br />a. Date reclamation began: <br />9. The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:* <br />10. Estimated total acres to be affected in the next report year:* ~]~ Jr <br />11. COI~ASENTS: <br />* Ple="ase show the location of the acreage for items 4 - 6 on your map**. <br />Indicate the phases of the reclamation which have been completed, correlated with <br />your timetable. For phased operations show dates extraction ceased and dates <br />reclamation began. <br />** NOTE: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 <br />through 6, then a new dap is unnecessary. However, this must be stated above. <br />~~~~~~g7 <br />Signature: ~ Date: <br />Please type or pri/n/t~ cu/rrent contact ~n[ame, mailing address, and phone /nuYmber below: <br />Contact Name: ~~G~~C~ S-f/YI ylU~1 Phone: (~~~) -f t I ~'lU/O ~jQ,R `t <br />//n1~~~ .1/,, ~^ FAX No: (30'3 ) ~{S'r{'..7 Y(c~/ <br />Company: ~ c~~P~"Yl !"1~`7 ~~t'riGl~^~ry/'1G. <br />Address : ~ 17~ SS ('7w ~ 7 ~ <br />Federal Tax ID No. or Social Security No.: U l~ `/ ~ S ~ ~ T <br />~@ <br />
The URL can be used to link to this page
Your browser does not support the video tag.