Laserfiche WebLink
<br />• <br />Mined Land Reclamation <br />STATION U11 <br />6 <br />July 10, 1990 <br />August, 1985 Not tied is this Survey <br />July, 1986 401,405.76 1,440,865.24 7335.14 <br />November, 1986 401,407.06 1,440,865.20 7334.60 z <br />July, 1987 401,405.85 1,440,865.20 7335.21 <br />October, 1987 401,405.81 1,440,865.28 7335.14 <br />June, 1988 401,405.91 1,440,865.46 7335.04 <br />November, 1988 401,405.93 1,440,865.31 7334.95 <br />July, 1989 401,405.97 1,440,865.36 7334.85 <br />November, 1989 401,405.97 1,440,865.37 7334.70 <br />July, 1990 401,406.04 1,440,865.64 7334.63 <br />Meaa 401,405.90 1,440,865.36 7334.96 a <br />Slope Stability Stations at Bear #3 Are Tied to D-11-U and D-12-U <br />through a series of primary loops: <br />Bear #3 U 16 <br />U 17 <br />U 18 <br />U 19 < <br />U 23 s <br />Table 2 and Table 3 is a list of slope stability Stations with <br />their coordinates and elevations from August, 1985, through July, <br />1990 and the resulting mean values. <br />TABLE 2 <br />SLOPE STABILITY <br />BHAR MINfi N0. 3 <br />• <br />STATION U16 <br />August, 1985 404,057.57 1,441,800.00 6267.62 <br />July, 1986 404,057.62 1,441,799.98 6270.39 <br />November, 1986 404,057.61 1,441,799.98 6270.36 <br />July, 1987 404,057.70 1,441,800.04 6270.33 <br />October, 1987 404,057.73 1,441,800.05 6270.37 <br />Tune, 1988 404,057.86 1,441,800.06 6270.35 <br />November, 1988 404,057.85 1,441,800.07 6270.38 <br />July, 1989 404,058.03 1,441,800.06 6270.37 <br />November 1989 404,058.06 1,441,800.02 6270.39 <br />July, 1990 404,058.12 1,441,800.04 6270.35 <br />MEAN 404,057.82 1,441,800.03 6270.37 1 <br />1Mean filevation does not include August, 1985 <br />zTied by triangulation-No distances <br />3Mean does not include November, 1986 <br />aMonument = #5 Rebar <br />SMonument = #7 Rebar in concrete <br />