Laserfiche WebLink
~Qn~e~- B <br />NORTHWEST COLORADO CONSULTANTS, INC. <br />,, - iii i~nii~~tii~iim <br />Project: Waste Coal Pile Projeet No.: 95-2296 <br />Location: Foidel Creek Mine Report No.: 29 <br />Client: Bower Brothers Construction <br />Work Performed: <br />RFCEr'r~=~~IVED <br />OCT 2 ~ 19~97~ ,997 <br />DIVISICn Ul ni <br />Date: <br />Time: <br />Mileage: <br />Engr.lfech: <br />i ieiaa ... u~.y~Y.~.:CCiC~Y <br />10/15/97 <br />2.0 <br />20 <br />JK <br />As requested, we visited the project site on this date to conduct nuclear density test No.'s 121 through 124 on the <br />processed waste coal placed and compacted in the south end of Area #1. We obtained moisture samples from <br />each test location and returned them to our laboratory. <br />We also ran a checkpoint Proctor on a bulk sample obtained from the test sites. The checkpoint matched Proctor <br />curve No. 2. <br />Remarks: <br />Compaction of the material ranged from 94% to 97% and moisture contents ranged from 0.1% to 2.2% above <br />optimum. <br />Please refer to the attached sheet for the results of today's testing. <br />Verbal Discussions: <br />Bud Bower of Bower Brothers Construction was informed of today's test results. <br />