Laserfiche WebLink
Geology ~Holci m <br />Ms. Barbara Chiappone <br />Division of Minerals and Geology <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />October 4,2002 <br />RE: Boettcher Ls Quarry: Permit # M-1977-348 <br />Dear Ms. Chiappone <br />Holcim (US) Inc. Phone 970 482 5600 <br />Building A Fax 970 482 5608 <br />4629 North Overlantl Trail www.holcim.com/us <br />P.O. Box 1468 <br />LaPorte, CO 80535 <br />~~~~8 ~ <br />OCT D ~ 1@2 <br />~rvlsion ofNlinerals and Geology <br />Attached are the Annual Report and a check in the amount $688.00 for the Boettcher Quarry. <br />The fee is for the reporting period October 10, 2001 to October 10, 2002. The Ft Collins cement <br />plant was closed on August 30, 2002. <br />Also attached is a Summary of the "Wildlife Monitoring" for the period 10/15'2001 through 8/15 <br />2002, and a copy of the Quarterly Analysis of CKD, as required by Revision Tr-3. The Plant <br />operations have shut down and no regular monitoring has occurred since that time. <br />A copy of the Letter of Credit in the amount $2,518,261.30 is attached as per the requirements of <br />2CCR 407-1, 407-4 and Rules 1.15(1)(a0. Holnam, Inc. changed its name to "Holcim (US) Inc on <br />December 12, 2001. The rider to the letter of credit reflects this change. <br />If you require additional information or clarification please contact me at the above address and or <br />phone number, or by a-mail at roy.stienmier@holcim.com. <br />Yours sincerely <br />Roy L. Stienmier <br />Chief Geologist <br />Attachments <br />cc: R. Moir <br />G. Benton <br />