Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />999 <br />BASIN <br />RESOURCES, ~N~. <br /> <br />a subsidiary of ENTECH, Inc. <br />Mr. Kent Gorham <br />Colorado Division of Minerals <br />1313 Sherman, Room 215 <br />Denver, CO 80203 <br />.,- ~ • <br />`14300 Highway 12 <br />Weston, Colorado 81091 <br />(719) 868-2761 <br />Purchasing (719) 868-2768 <br />Fax (719)868-2275 <br />3'In,! ~ ~QS <br />~~~~~ ~~ v~1~ October 3, 1995 <br />and Geology ~`~~~ <br />RE: Golden Eagle Mine; Permit C-81-013 <br />Subsidence Report, 1st Half 1995 <br />Dear Mr. Gorham: <br />~~Ci~\ , X095 <br />OCj Q ~ <br />Jra\QOy <br />M\~~z~~ <br />This is in response to your letter dated August 23 concerning <br />the Golden Eagle subsidence information. Each point will be <br />addressed as per your original letter. <br />1) During the first half of 1995, the second panel was mined <br />out during February. The third panel started up in early June and <br />advanced approximately 600 feet. The third panel was started <br />approximately 880' East of its original planned initiation point. <br />Mining should continue in panel 3 throughout the remainder of the <br />year. The 4th panel is not expected to start until mid-1996. It <br />will also be shortened approximately 880' on the East end. <br />There are six sets of subsidence monuments in place. The 3rd <br />North Railroad Monuments were established adjacent to the railroad <br />tracks on March, 1988 over the 3rd North mains. The Santistevan <br />Canyon monuments were established over the west end of the 1st <br />panel parallel and perpendicular to t-he panel. The Zamora Canyon <br />monuments are set perpendicular to the 2nd, 3rd, and 4th panels. <br />The East Panel monuments are set perpendicular to the 2nd, 3rd, and <br />4th panels on the East end. The 3rd North monuments are set <br />parallel to the East end of the 2nd panel. A new set of points, <br />identified as NW3 West End Monuments, parallel to the West end of <br />the 3rd panel were established in June. <br />During this period, only the 3rd North monuments were affected <br />by subsidence. The point in the center of the panel showed a drop <br />of 4.6'. The remaining sets of points did not show signs of <br />subsidence. The subsidence effects on NW3 West End Monuments will <br />be registered in the 3rd quarter survey. <br />The attached report on the 3rd North Railroad Monuments gives <br />a detailed explanation of the results of that survey information. <br />It is this information that supports the TR40 request for <br />discontinuation of monitoring. <br />