Laserfiche WebLink
Rajah 30 Mine Anuual Report <br />November 2004 <br />No mining or surface reclamation occurred at the site during the past yeaz. <br />In cooperation with the DMG, a bulkhead was constructed in the Rajah 30 adit, and it was <br />completed in December of 2003. Inspections were conducted in 2004 in accordance with the DMG <br />approved bulkhead monitoring plan. <br />No new disturbances are expected during the coming year, as the site is inactive. Final reclamation <br />construction is scheduled for the coming yeaz, and Umetco will continue to monitor the site surface <br />and repairs will be made as necessary. Inspections will also be conducted in accordance with the <br />DMG approved bulkhead monitoring plan. <br />A map is not included because there have been no new disturbances during the past year. <br />04.162.doc <br />