My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1989-07-03_REPORT - M1977315 (3)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977315
>
1989-07-03_REPORT - M1977315 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2023 5:58:08 PM
Creation date
11/27/2007 7:14:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977315
IBM Index Class Name
Report
Doc Date
7/3/1989
Doc Name
BESTWAY PAVING CO ANNUAL REPORT PN 77-315 REPORT AS OF 04/24/89
From
BESTWAY PAVING CO
To
MLRD
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I 131 NORI 999 <br /> III III III III IIII III <br /> POST OFFICE BOX 3189 <br /> _ BEST- WAY PAVING CO. GREELEY, DO <br /> ZIP CODE 806330833 <br /> GREELEY 353-1654 <br /> DENVER 623-9438 <br /> June 26, 1989 <br /> RECEIVED <br /> Department of Natural Resources JUL 3 1989 <br /> Mined Land Reclamation Division MINED LAND <br /> 131 centennial Building RECLAMATION DIVISION <br /> I313 Sherman Street <br /> Denver, CO 80203-2273 <br /> Re: Best-Way Paving Co, Annual Report; Permit No. 77-315; <br /> Report as of April 24, 1969 <br /> Gentlemen: <br /> 1. Excavation of Phases 4 and 5 was completed during 1987, 90% of reclamation <br /> of the east part of Phases 4 and 5 has been completed however will not be <br /> brought to grade until the remainder of the phases are backfilled and top- <br /> soil added. Approximately 70% of Phase 6, 55% of Phase 7, 42% of Phase 8, <br /> have been excavated during 1967-1988, and extending approximately one (1) <br /> acre into Phase 12. 30% of reclamation work completed in Phase 6 and 12. <br /> There has been no activity in Phase 1 during the year. Total acres affected <br /> during 1988 was 12.8. <br /> 2. Topsoil placed on the slope on the north side of Phase 2, 98% completed, <br /> The bottom portions of Phases 2 and 3 have been brought completely to grade <br /> and topsoil placed. <br /> 3. Approximately one (1) additional acre east of present excavation will be <br /> extracted from Phase 12 during 1989. This is all the excavation that will <br /> occur in Phase 12 as we will be at our required limits to the boundaries of <br /> the property and the phase. The portions of Phases 6 and 12 excavated dur- <br /> in 1988 will have fill dirt replaced up to the topsoil stage during 1989, <br /> 4. It has been necessary to excavate Phases 6, 7, 8 and the small area of <br /> Phase 12 in the manner which we are working in order to reclaim those areas <br /> as required. This has been due to the small acreage area of the phases and <br /> our ability to work to depth and then properly reclaim. <br /> If any additional information is required, please lCK --^� <br /> Very truly yours, <br /> 9 Lo <br /> Carl V. Hill, Jr. <br /> President <br /> end <br />
The URL can be used to link to this page
Your browser does not support the video tag.