Laserfiche WebLink
<br />} - ~ 1 <br />Notice of Ir~nt to Continue Mining Operati~s .~ .r~i /! <br />1 12 Annual Report <br />Permittee Name: Jefferson County <br />~ermit No: M-77-245 JAN 31 199 - <br />Aeration Name: Pine Junction Quarry lvil^nr~ Land <br />Anniversary Date: 01!31!92 '" <br />Total: $430.00 (Due on your Anniversary Date} . ,~,~D3 <br />1. Has your mine been granted TEMPORARY CESSATION STATUS? YES NO <br />Does your mine operate MORE or LESS than 184 days per year? MORE LESS <br />2. Total acres affected during the report year:* 18.73 total, with 4.2± in 1991 <br />3. Total acres reclaimed for the report year:* None <br />4. Total acres in various stages of reclamation:* <br />a. Backfilled: None d. Topsoil replaced: None <br />b. Graded: None Average topsoil thickness <br />c. Seeded: None replaced: stockpi]ing occurring_ <br />List species seeded 8~ seeding <br />rate for report year on back. NIA <br />5. The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:* None <br />6. Estimated total acres to be affected in the next report year:* Affected lands <br />should notincreese significantly beyond that already opened under Sequence One <br />and Two excavation except as necessary to effect planned excavation sequence. <br />CDMMENTS: Sequence One and Two Excavation is Active. Sequence Three <br />Excavation is not anticipated for 1992. Reclamation pending construction of <br />the visual berm which is deferred pending development of adequate room on <br />quarry floor. Next reclamation will commence'" 1999 depending upon finished <br />area of quarry walls. <br />* Please show the location of the acreage for items 2 - 6 on your map**. <br />Indicate the phases of the reclamation which have been completed, correlated with <br />your timetable. No change since the 1 1!12191 Technical Revision as approved by the <br />CMLRD on 1 1!19!91. Revised Exhibit F -Reclamation Plan Map included for reference. <br />NOTE: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 <br />through 6, then a new/map is unnecessary. Howeuer, you must state this fact above. <br />Signature: I'Vlp~l >~e~~ Date: /~1 I9~ <br />Please type or print current contact name, address, and phone number below: <br />Contact Name: Mel Koleber hone: {303} 271-5204 // <br />Company: Jefferson County, Colorado <br />Address: 1700 Arapahoe Street <br />Golden, CO. 80419-0401 <br />~deral Tax ID No. or Social Security No.: Tax ID ~` <br />i <br />~~a~ <br />13`~ <br />