My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-09-29_REPORT - M1977348
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977348
>
2005-09-29_REPORT - M1977348
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 7:48:21 AM
Creation date
11/27/2007 7:13:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977348
IBM Index Class Name
Report
Doc Date
9/29/2005
Doc Name
Annual Fee/Report/Map
From
Holcim (US) Inc.
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~H o I c i m Holcim (US) Inc. Phone 970 482 4065 <br />Building C Faz 970 482 1363 <br />4629 N. Overland Trail www.holcim.comlus <br />P.O. Box 1548 <br />LaPorte, CO 80535 <br />Ms. Tawnya Deherrera <br />Division of Minerals and Geology <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />September 26, 2005 <br />RE: Boettcher Limestone Quarry: Permit# M-1977-348 <br />Dear Ms. Deherrera: <br />RECEIVED <br />SEP 2 92005 <br />Division of Minerals and Gaolopy <br />This quarry is currently under reclamation, Permit # M-1977-348. Reclamation activities <br />commenced on approximately 8/15/05 with completion expected by 2006. <br />Attached is the Annual Report and a check in the amount $688.00 for the Boettcher <br />Limestone Quarry. The fee is for the reporting period October 10, 2004 to October 10, <br />2005. <br />Also Attached is a Summary of the "Wildlife Monitoring" for the period 10/2002 through <br />8/2003, and a copy of the last Quarterly Analysis of CKD, as required by Revision TR-3. <br />No CKD has been produced since the attached analysis. The plant operations have <br />shut down and no regular monitoring has occurred since that time. <br />A copy of the Letter of Credit in the amount of $2,518,261.30 is attached as per the <br />requirements of 2CCR 407-1, 407-4 and Rules 1.15(1) (a0. Holnam, Inc, changed its <br />name to "Holcim (US) Inc on December 12, 2001. The rider to the bond reflects this <br />change. <br />If you require additional information or clarification please contact me at the above <br />address and or phone number, or by a-mail at Gordon.bentonCa)holcim.com. <br />Yours si er~ty, <br />~J;~---- <br />G rdon Benton, Project Manager <br />Attachments <br />cc: Kathy Shanteau <br />Todd Richards <br />Strength. Performance. Passion. <br />
The URL can be used to link to this page
Your browser does not support the video tag.