My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP35764
DRMS
>
Back File Migration
>
Report
>
REP35764
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:13:11 AM
Creation date
11/27/2007 7:13:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Report
Doc Date
1/6/1999
Doc Name
BOWIE 1 MINE ACTIVE AND RECLAIMED COAL MINE WASTE BANKS QUARTERLY INSPECTION REPORTS PN C-81-038
From
J E STOVER & ASSOCIATES
To
DMG
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />BOWIE RESOURCES LIMITED RECEIVED <br />Bowie No. 1 Mine SAN 0 6 1999 <br />Reclaimed Coal Mine Waste Bank Inspection - 4"' Quarter 199@n or Minerals & Geology <br />On December 22, 1998, I performed a quarterly visual inspection of the Bowie No. 1 <br />Mine reclaimed coal mine waste bank in accordance with Rule 4.10.2. <br />I, J. E. Stover, P.E., have a wide variety of experience in the design and construction of <br />earth fill embankments. Nothing was observed during the inspection that would <br />indicate the pile has a potential for failure. The pile and surrounding area were snow <br />covered. No seeps or spoil springs were noted. The pile has been reclaimed. The pile <br />blends in with the surrounding area so it is difficult to determine the areal extent of the <br />reclaimed waste pile. Records indicate 15" to 24" of non-toxic material was placed over <br />the coal mine waste. <br />According to the permit, this waste pile was filled to capacity in August 1983 and <br />reclaimed. In the spring of 1985, spontaneous combustion was detected. Topsoil and <br />cover material were excavated and the hot spot was removed. The area was <br />apparently reclaimed again during the Summer of 1988. <br />The design of the waste disposal area is presented in Volume 6A. To the best of my <br />knowledge and belief, based on my inspection of the pile and previous inspections by <br />professional engineers, the coal mine waste bank has been constructed in accordance <br />with the approved plan. According to previous inspections, the pile was constructed <br />with 1.5H:1 V outslopes. This was visually confirmed during the inspection. <br />The pile is located in a remote area well away from human habitation. A failure of the <br />pile might damage the sediment pond located below the pile. However, a failure of the <br />pile would probably not be a hazard to human life. <br />Recommend maintenance: None <br />.••"••. <br />o~~PpO REg~s~~ <br />r <br />G~ • ~ • ~O <br />James E. <br />P.E. NQ.•'1 <br />~NAL ~Ni ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.