My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP35645
DRMS
>
Back File Migration
>
Report
>
REP35645
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:12:58 AM
Creation date
11/27/2007 7:11:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
Report
Doc Name
APPENDIX 1-B TO BLUE RIBBON COAL COMPANY TR REQUEST MINE BENCH STABILIZATION
Permit Index Doc Type
STABILITY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s <br /> <br />- - o Underground coal waste constructed in lifts and compacted to <br />- - 908 Standard Proctor density at a slope of 25 degrees from <br />the toe to within 4 feet of the top of the slope. <br />0 30 feet high, 60 feet wide berm constructed of coal waste at <br />_ the toe of the slope. <br />- - 0 4 foot depth of recompacted overburden fill material placed <br />' over the coal waste. <br /> 0 10 feet high, 20 feet wide rock berm. <br />~ NORT HERN SECTION <br /> o Only partial excavation of toe area and replacement with <br />I <br />- recompacted fill material. <br />I o Underground coal waste constructed at a slope of 25 degrees <br /> <br />• from the toe to within 4 feet of the top of slope. <br /> 0 4 foot depth of recompacted overburden fill material placed <br /> over the coal waste. <br />- 0 30 feet high, 100 feet wide berm constructed of recompacted <br />' existing bench fill material. <br /> <br />' o <br />GO I No rock berm. <br />N C <br />TON <br /> T <br />o . T <br />H <br />Excavation of toe area. <br /> o Replacement of excavated toe area with select sand and <br /> gravel material meeting design requirements. <br /> <br />• o Lower 30 feet of slope area to be constructed of recompacted <br /> existing bench fill material. <br /> o Underground coal waste constructed at 25 degrees from within <br /> 4 feet of the top of the slope to within 30 feet of the toe. <br />' 0 4 foot depth of recompacted overburden fill material placed <br /> over the coal waste. <br /> <br />21 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.