Laserfiche WebLink
n <br />The Sievers Ditch has had the concrete removed and has been regraded with a <br />dirt base. This whole area has been seeded and mulched also. The train load <br />out area has all been regraded with topsoil replaced, The operator sampled <br />this material prior to seeding and results of this sampling will be forwarded <br />to the Division. The Division also took eight samples at the load out area. <br />Documentation is being sent to the OSM. The analysis from the laboratory have <br />not been received to date. All areas at the load out have been seeded and <br />mulched except for the old rail road turn area which will be seeded next <br />spring in a hay alfalfa mix. Mr: Gilfree did have some problem with the <br />splitter boxes on the irrigation system. There are three of these structures <br />which he would like wing walls placed around the outlet. Mr. Reschke stated <br />that they would be happy to place the wing walls on these structures. We will <br />check at later inspections to see the status of these splitter boxes. At this <br />point the Division will allow this matter to be handled between the land owner <br />and the Snowmass Corporation. <br />v~ r <br />4080E <br />