My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP35630
DRMS
>
Back File Migration
>
Report
>
REP35630
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:12:58 AM
Creation date
11/27/2007 7:10:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Report
Doc Date
11/16/1992
Doc Name
C-81-019 COLOWYO COAL CO SECTION 16 FILL
From
COLOWYO COAL CO
To
DMG
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c: <br />COAL <br />COMPANY <br />November 13, 1992 <br />Mr. Steve Wathen <br />Reclamation Specialist <br />Colorado Division of Minerals and Geology <br />215 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Re: C-81-019, Colowyo Coal Company <br />Section 16 Fill <br />Dear Mr. Wathen, <br />iii iiiiiiiiiiiiiiii <br />999 <br />5731 State Hignway 73 <br />Meeker, Colorado 81641 <br />(303) 824-4451 <br />`~,F .- .. <br />6V©~ ~ ~' 199 <br />_~Ib <br />t.Y,. .~. <br />The purpose of this letter is to provide a response to the <br />concerns raised by Mr. Jim Pendleton of your office in his memo <br />dated November 6, 1992. <br />The following responses are in the order presented on Jim's <br />memo. <br />1) Colowyo proposed in the Section 16 Inspection Plan that <br />the required certified inspection reports would be <br />available for inspection by the Division and would be <br />submitted to the Division in the Annual Reclamation <br />Reports. The Division subsequently approved this <br />procedure and Colowyo has taken steps to comply with this <br />commitment. You will recall that we had inspection <br />reports available for your review during yesterday's <br />inspection. Mr. Pendleton has indicated that Rule <br />4.09(1)(11) requires instead, that each required <br />inspection report shall be submitted to the Division <br />within two weeks after the inspection is completed. <br />Colowyo will comply with this requirement and the first <br />inspection report for "removal of all organic material <br />and topsoil" is submitted herein for the Division's <br />records. At your request we have also included an <br />inspection report addressing the issue of monitoring for <br />overall hazardous conditions. <br />2) Colowyo's submittal for the initial Section 16 Fill <br />configuration committed to an investigation into the <br />existence of shallow bedrock at the toe of the fill. <br />Colowyo's commitment to submitting to the Division for <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.