My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP35589
DRMS
>
Back File Migration
>
Report
>
REP35589
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:12:56 AM
Creation date
11/27/2007 7:10:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977215
IBM Index Class Name
Report
Doc Date
4/14/1997
Doc Name
EVALUATION OF UPPER & LOWER TAILINGS PONDS AT BULLDOG MINE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldog Mine Tailings Ponds Evaluanort <br />i. Snterceptor wells were installed downgradient of the embankment in 1980, but <br />were abandoned at the end of 1980 due to sand accumulation in the wells. <br />2. A slurry cutoff wall was constructed through the near-surface alluvium <br />downgradient of the embankment in 1982, along with a drainage trench and <br />pump-back system upgradient from the slurry cutoff wall. Three monitoring <br />wells were installed down gradient from the slurry cutoff wall. <br />3. In 1983 a slurry trench was constructed along the core of the Lower Tailings Pond <br />embankment to enhance stability and to impede seepage, along with installation <br />of associated piezometers to monitor pore water pressures. <br />After discharge of tailings to the Lower Tailings Pond ceased in 1985, cyanide concentrations <br />and ground water levels in associated monitoring wells and piezometers gradually declined. The <br />Lower Tailings Pond was reclaimed in 1993 and associated monitoring wells and piezometers <br />were plugged and abandoned. <br />The Upper Tailings Pond has been reclaimed in a manner similar to the Lower Tailings Pond. <br />Due to lower permeability materials beneath the tailings, the Upper Tailings Pond did not <br />• experience the seepage issues or require the related remedial construction work listed above for <br />the Lower Tailings Pond. <br />• <br />Nonret~ake blining Company' Shepherd .l/filler, lnc. <br />p~u-s N~mdfrLg.pn ~ dprrl 1 J. 1997 <br />
The URL can be used to link to this page
Your browser does not support the video tag.