Laserfiche WebLink
M III IIIIIIIIIIIIIIII <br />ee <br />DC~~4A 5~+1~]D <br />loildD GRAVEL Pao <br />P.O. BOX 103 DELTA, COLORADO 81416 <br /> <br />~~ <br />March 7, 1988 <br />Mined Land Reclamation Division <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Attention: Mr. David C. Shelton <br />~~~~~~~® <br />MAR 141988 <br />DECLAMATION DWISION <br />RE: Notice of intent to con- <br />tinue mining. <br />Delta Sand & Gravel Co. <br />Permit IIM77-20, Pit II1 <br />Dear Mr. Shelton: <br />Our anniversary date for this permit is March 23. We mined approximately <br />120,000 tons of material from this pit in the past year. We continue to <br />operate in Stage I and may complete mining in Stage I in the coming year. <br />Mining also began in the upper part of Stage II to create more pit space <br />so that Stage I could be completed and the transition made to Stage II. <br />Annual report questions as outlined in Section 2:41 of the rules and <br />regulations are answered as follows: <br />1. Approximately 1.75 acres + was mined of the final 8 feet of <br />gravel in Stage I. Approximately 3.8 acres + of Stage II <br />was mined to a depth of about 20 feet. (See annual Report Map) <br />2. Reclamation began on the East and South sides of Stage I. <br />Reclamation to date involved grading slopes. <br />3. N.A. <br />4. N.A. <br />5. N.A. <br />6. N.A. <br />7. In the coming year we will probably complete mining of Stage I. <br />Approximately 2 acres + of the bottom 8 feet of the deposit remain <br />to be mined in Stage I. Phase I of reclamation will commence after <br />Stage I mining is completed. Mining will then continue in Stage II <br />with removal of material from the bottom 8 feet of the deposit in <br />DELTA 874.9759 PAONIA 527.4174 RANGELY 675.2315 <br />