Laserfiche WebLink
<br /> <br />Vernon Dilley Annual report on Ayers Pit 2-2-91 <br />D'ap <br />h~ <br />0 <br />car ~7f' <br />3. Nost all affected area is used for a work area, but as gravel is <br />removed the affected area blends in with existing terrain. <br />4. All mined acres are in various stages of reclamation to meet the <br />existing Terrain, or they are already blended in, which is aprox <br />three acres. <br />(a) No backfilling is necessary at this time. <br />(b) Grading is primarily done with the excavation of gravel. <br />(c) No seeding has been done. <br />(d) We do not have any topsoil to replace. Gravel comes to the <br />top surface. <br />5. None <br />6. one to two acres. <br />~. We do have some trees growing where we will not destroy them <br />during f[Lture excavating. <br />1 i~~~ <br />