My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP35462
DRMS
>
Back File Migration
>
Report
>
REP35462
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:12:46 AM
Creation date
11/27/2007 7:07:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977285
IBM Index Class Name
Report
Doc Date
4/26/1999
Doc Name
ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ANNUL REPORT <br />INSTRUCTIONS <br />According to C.R.S. 34-33-I Iti(3). and C.R.S. 34-33.5-116(3)(x). on the anniversari date of the permit each year. <br />the operator shall submi[ a report and a map showing the extent of current disturbances to affected land, <br />reclamation aa=omplis'hed to date and dunng the preceding year, new disturbances that are anticipated to occur <br />dunn~ the upcoming year. and reclamation that will be performed during the upcoming year. Please anach such <br />a report and map to enclosed annual report form. (An adequately labeled map that clearh~ delineates and includes <br />the above elements may suftice for a written report.] <br />If your operation is subiect to the provisions of Temporary Cessation as defined in the Act and Rules, you must <br />provide with the Annual Report the following information as required b_; '_ CCR -107-1, 407-4, and Rules <br />1.13.7( 1)(a): <br />(L) the: condition of the operation at the time of cessation: <br />u ~ ~.vha[ specific meas!~res have been end will be implemented to comply with reclamation. <br />(, <br />petforrnance standards and Environmental Protection Plan requirements, if they are part of your <br />approved application; and <br />(iii) plans for resumption of mining operations. <br />Please provide the additional following information with your Annual Report, as applicable: <br />(a) Pet the requirements of 3 CCR 407-1.407-4, and Rules 1.15(1), provide an updated statement <br />regarding the sufficiency of the value of the Financial Warranty, specifically: <br />(rj Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1)(x), provide an updated <br />statement regarding the sufficiency of the value of the financial warranty. Specifically, <br />irrevocable letters of credit, Deeds of Trust, and security agreemen[s, self-insur:mce. salvaee <br />credit, and first priority liens on project related fixmres. <br />(ii) Per the requirements of 2 CCR 407-1.307-3, and Rules 1.15(1)(b), permits secured with a <br />Deed of Trust or a Security Agreement, the operator shall submit an update, by a qualified <br />independent appraiser, indicating any changes in propem value, and a statement summarizing <br />any circumstances which may affect the adequacy of the Deed of Trust, or Security Agreement, <br />and the value of the property subject to either of these instruments. <br />The report shall also provide proof that there are no pas[-due property taxes. <br />(iii) Per the requirements of 3 CCR 407-1.407-4, and Rules 5.713 j, permiU sec'ared with an <br />Irrevocable Le¢zr of Gcdi[, the operator shall have the bank provide documentation m the form <br />of a balance sheet, certified by a Cettified Public Accountant. demonstratins [hat the <br />Letter of Credit does not exceed ten percent (1090) of the bank's capital surplus accounts. <br />(vi) Per the requirements of .CCR-107-L 407-4, and Rules 4.93(c), permits secured by a First <br />Priority Lien on any fixtures and Equipment, the operator shall provide a report in sufficient <br />detail to fully describe the condition. value. and location of all pledged fixtures <br />and equipmen[. <br />(bj Per the requirements of'_ CCR 407-I. 407--1, and Rules 1.15(1)(cl, all monitoring information <br />required as part of the approved permit application, to include the Environmental Protection Plan. <br />(Phase note that if you are not a Designated Ivtining Operation, you will not have an Environmental <br />Protection Plan as par[ of your a proved permit.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.