Laserfiche WebLink
POWDERHORN <br />COAL COMPANY <br />III lIIIIIIIIIIIIIII <br />sss <br />P O. Box 1430 <br />Palisade, Coloratlo 81526 <br />(303) 466-7951 <br />Fax (303) 4667181 <br />September 14, 1994 <br />Ms. Erica S. Crosby <br />Environmental Protection Specialist <br />Colorado Division of Minerals and Geology <br />1313 Sherman St., Room 215 <br />Denver, CO 80203-2273 <br />RE: Certifications, File C-81-041 <br />Dear Ms. Crosby: <br />RFrFlVED <br />SE'P 1 ~ t <br />Geology <br />Enclosed please find refuse pile certifications for the cover <br />"critical phase". Separate certifications are enclosed for the <br />separate piles on the work in May thru July 1994, and for the <br />work on CRDA 2 in August and September 1994. Also enclosed is a <br />certification for the Cameo Borrow Area No. 1 Sump. <br />Please let me know if you have any questions concerning these <br />certifications. <br />Sincerely, <br />Larry M. Reschke, PE <br />Engineer <br />Enclosures <br />LMR <br />cc: Brian Dunfee(PWCC) <br />Dick Reisinger(WACC) <br />