Laserfiche WebLink
OWENS BROS. CONCRETE CO. <br />Annual Report for Del Camino Sand and Gravel Mine <br />M-1996-052 <br />Division ofMinerals and Geology <br />Mined Land Reclamation Boazd <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />To Whom It May Concern: <br />As of 7uly 31, 2003, mining has begun on the property including surface stripping and preliminary <br />extraction of the indicated mine area, in red crosshatching on the attached map. We have not finished <br />extraction-in-this area and•therefore no-reclamationhas-been-undertaken.at.this time, The. processing-_ .. <br />plant, product storage azea, scale, and all related support equipment have been ful]y set up in the area <br />indicated by the blue crosshatches on the attached map. The blue dash lines indicate the haul route being <br />used to move material from the mina area to the processing plant. Wash water settling ponds have also <br />been set up and they are indicated by the green crosshatching on the attached map. <br />During the coming period of August 1, 2003 to 3uly 31, 2004 we will continue to mine the property. We <br />intend to install a conveyor to move material between the two active sections of the property in the <br />approximate area of the current haul road. If sufficient extraction occurs to allow, we will also begin <br />reclamation along the north edge of the red crosshatched mine area. <br />If there are any questions or concerns about the planned operations or the areas that they shall be located <br />in, please feel free to contact me at 303 429-5850. <br />Respectfully, r~ <br />~~~ ~ ~ l~/ <br />William M. Owens <br />Asst. Treasurer <br />