Laserfiche WebLink
Figure 9b. Total Precipitation for the 4 Months (April-July, 1987.2000-. Seneca II Mine, SCC • 2000. <br />• ?25 <br />10 <br />a~ <br />t <br />U <br />C <br />C <br />O <br />J <br />N <br />r <br />• a <br />d <br />o_ <br />25 <br />Year <br />• ® PPT received m previous 4 months <br />1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 7999 2000 <br />