Laserfiche WebLink
Colorado Division of Minerals and Geology <br />~ /J Annual Reclamation Report for the Year~y-- Z~~lr/J <br />C p~l<<jillr /d/irt.o . C ~~-a4~ ~'~sfsd `cr:/~cu...~,.y~ <br />mine name permit # Permittee <br />Atldress: <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It shoultl include tent, discussion, and maps, at a minimum, in addifion to any other <br />reclamation monitoring data as required by the approved permit. The location of the acreage reportetl <br />under each land status category and year of seeding (if applicable) should be Beady and accurately <br />identified on a map included with the report. <br /> Last Years This Calendar <br />Land Status Cat o Cumulative Total Year Cumul <br />alive Total' <br />Acres disturbed ~ + ~ _ / <br />rv <br />Acres backfilled and raded + ~J = // <br />Co <br />Acres to soiled + ~ _ <br />Seeding typically begins the minimum 10-year reclamation liability period. Please report the acres for <br />each category below. Do not inclutle acres that have achieved final, Phase III release. <br /> Last Years This Greater <br /> Cumulative Calendar Cumulative 10 years or than 10 <br /> Total ear Total' less ears' <br />Acres seeded' + [} _ _ // <br />ro + ~ <br />'include, if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine the total number of acres disturbed Co and the total number of acres: <br />Phase I released w Phase II released ~_ Phase III released d <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed b <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation fadlities Z, <br />v <br />Acreage in active mining areas' U <br />'(exclude acres where Phase III release has been achieved) <br />' Includes haul and access roatls; temporary tlams antl impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitodng sites; topsoil stockpiles; overburden stockpiles; repair, storage arM construction areas; <br />office area, repair shops, and parking; coal stockpiles, loatling, and processing areas; railroads; coal conveyors; nonbackfilled aril <br />graded areas of refuse piles, coal mine waste impoundments, head-of-hollow fills, antl valley fills; vendlafion shafts and emryways; <br />and noncoal waste disposal area (garbage dumps and coal combustion by-products disposal areas). <br />' Includes pits, topsoil sbippetl areas in advance of pits, and spoil not backfilled and gretled <br />