Laserfiche WebLink
3. <br /> 7. Estimates and Location and Number of Acres to be Affected in the <br /> oming ear <br /> The Boettcher plant is scheduled to be shut down during <br /> the 1989 year. Production will continue until sometime <br /> in December, 1988. During the shutdown, modifications <br /> will be made to the plant process equipment to utilize <br /> the high-kerogen limestones of tim E-Bands of the Niobrara <br /> formation. The only quarry activity anticipated is the <br /> possible cleanup of the new mining area which will be <br /> used at the re-startup. This area is already disturbed, <br /> having been mined in the past. Thus , no new disturbance <br /> 8. The anticipated <br /> ffect v et date of the 9information included in this report; and <br /> any accompanying map(s) is October 1, 1988, <br /> Signed Paul E. Thomsen <br /> Title Sr. Mining Engineer <br />