Laserfiche WebLink
Poverty Gulch /Tenderfoot Project -- REVISED BID SCHEDULE pg 2 of 2 <br />ID <br />Feature <br />Closure Method <br />Bid Amount <br />352 <br />Shaft <br />Polyurethane, 10 Cu. Yds. <br />353 <br />Shaft <br />Panel, 3 (B) Panels <br />354 <br />Stops <br />Cable Net Closure, 2200 sq. ft. <br />355 <br />Stope <br />Cable Net Closure, 2000 sq. ft. <br />356 <br />Shaft <br />Panel, 2 (B) Panels <br />357 <br />Adit <br />Adit Door, 70 sq.ft. <br />358 <br />Shaft <br />Backfill, 27.0 Cu. Yds. <br />11 5 `- <br />360 <br />Shaft <br />Panel, 4 (B) Panels <br />361 <br />Adit <br />Grated Culvert, 20 - 36" Diam. CSP <br />362 <br />Adit <br />Steel Grate, 72.0 Sq. Ft. <br />363 <br />Adit <br />Grated Culvert, 15 - 36" Diam. CSP <br />364 <br />Shaft <br />Backfill, 107.0 Cu. Yds. <br />365 <br />Shaft <br />Backfill, 52.0 Cu. Yds. <br />,��,��•� <br />366 <br />Shaft <br />Polyurethane, 13 Cu. Yds. <br />367 <br />Shaft Shaft <br />Polyurethane, 12 Cu. Yds. <br />368 <br />Shaft <br />Backfill, 47.0 Cu. Yds. <br />369 <br />Shaft <br />Panel, 2 (B) Panels <br />370 <br />Shaft <br />Backfill, 52.0 Cu. Yds. <br />-�•'- <br />371 <br />Shaft <br />Backfill, 135.0 Cu. Yds. <br />372 <br />Shaft <br />Polyurethane, 7 Cu. Yds. <br />373 <br />Shaft <br />Polyurethane, 10 Cu. Yds. <br />j 3.3`> <br />374 <br />Stope <br />Backfill, 65 Cu. Yds. <br />375 <br />Shaft <br />Polyurethane, 13 Cu. Yds. <br />376 <br />Shaft <br />Panel, 1 (B) Panels <br />377 <br />Adit <br />Adit Door, 35 Sq, Ft. <br />/ <br />378 <br />Shaft <br />Backfill, 20 Cu. Yds. <br />- <br />379 <br />Shaft <br />Panel, 2 (B) Panels <br />420 <br />Shaft <br />Backfill, 80. Cu. Yds. <br />3 <br />421 <br />Shaft <br />Backfill, 21.0 Cu. Yds. <br />422 <br />Shaft <br />Monolithic Plug, 18 Cu. Yds. <br />� ' <br />423 <br />Shaft <br />Backfill, 593.0 Cu. Yds. <br />424 <br />Shaft <br />Panel, 3 (B) Panels <br />- <br />425 <br />Shaft <br />Panel, 2 (B) Panels <br />„ <; - <br />426 <br />Shaft <br />Backfill, 43.0 Cu. Yds. <br />- <br />427 <br />Shaft <br />Backfill, 130.0 Cu. Yds. <br />• -; /p - <br />Enter SUBTOTAL here and on Bid Schedule page 1, Item 2. �� U <br />Additional openings, Bid item 3: <br />ID Feature Closure Method Bid Amount <br />_ rs . <br />39M Stops Mono Plug, 25 Cu. Yds., Salvage access Q /moo <br />Q� <br />M -78 -082 Shaft Polyurethane,set salvaged access �I 7 Ln <br />p �— <br />Enter SUBTOTAL here and on Bid Schedule page 1, Item 3. <br />