Laserfiche WebLink
<br /> <br />1 <br /> <br />1 <br />r <br />N <br />i <br />i <br />DIVISION 1 -GENERAL REQUIREMENTS <br />SECTION 01050 -FIELD ENGINEERING <br />1.01 SURVEYING <br />The engineer will field establish horizontal and vertical control points only. It shall be the <br />responsibility of the contractor to provide construction staking for horizontal and vertical alignment <br />as well as appurtenant features of the work. <br />1.02 SUPERVISION <br />The contractor shall have supervision, be knowledgeable of the project requirements and proper <br />installation and construction procedures, and be available in the field at all times that work is <br />progressing. <br />END OF SECTION <br />07/97 <br />Section 01050 -Page 1 of 1 <br />