Laserfiche WebLink
<br />Nothing contained herein is intended to imply that the Contractor does not have the right to have <br />tests performed on any material at any time for his own information and job control so long as the <br />Engineer does not assume responsibility for costs or for giving them consideration when appraising <br />quality of materials. <br />1.03 TEST REPORTS <br />Reports of all tests made by testing laboratories shall be distributed by the testing laboratory as <br />follows: <br />' 1 copy -Contractor <br />1 copy-applicable supplier or Subcontractor <br />7 copy-Engineer <br />Other copies - as directed. <br />1.04 CONTRACTOR'S QUALITY CONTROL SYSTEM <br />A. General <br />The Contractor shall establish a quality control system to perform sufficient inspection and <br />tests of all items of work, including that of Subcontractors, to insure conformance to the <br />Contract Documents for materials, workmanship, construction, finish, functional <br />performance and identification. This control shall be established for all construction except <br />1 where the Contract Documents provide for specific compliance tests by testing laboratories <br />or the Engineer. The Contractor's quality control system shall specifically include all testing <br />required by the various sections of the Specifications. <br />The Contractor's quality control system is the means by which he assures himself that his <br />construction complies with the requirements of the Contract Documents. Controls shall be <br />adequate to cover all construction operations and shall be keyed to the proposed <br />' construction schedule. <br />END OF SECTION <br /> <br /> <br /> <br /> <br />LI <br />' 07/97 Section 01400 -Page 2 of 2 <br />1 <br />