My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP34944
DRMS
>
Back File Migration
>
Report
>
REP34944
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:11:58 AM
Creation date
11/27/2007 6:59:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983090
IBM Index Class Name
Report
Doc Name
TECHNICAL SPECIFICATIONS FOR CONSTRUCTION OF LAPOUDRE PIT SLURRY WALL WELD COUNTY COLO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Nothing contained herein is intended to imply that the Contractor does not have the right to have <br />tests performed on any material at any time for his own information and job control so long as the <br />Engineer does not assume responsibility for costs or for giving them consideration when appraising <br />quality of materials. <br />1.03 TEST REPORTS <br />Reports of all tests made by testing laboratories shall be distributed by the testing laboratory as <br />follows: <br />' 1 copy -Contractor <br />1 copy-applicable supplier or Subcontractor <br />7 copy-Engineer <br />Other copies - as directed. <br />1.04 CONTRACTOR'S QUALITY CONTROL SYSTEM <br />A. General <br />The Contractor shall establish a quality control system to perform sufficient inspection and <br />tests of all items of work, including that of Subcontractors, to insure conformance to the <br />Contract Documents for materials, workmanship, construction, finish, functional <br />performance and identification. This control shall be established for all construction except <br />1 where the Contract Documents provide for specific compliance tests by testing laboratories <br />or the Engineer. The Contractor's quality control system shall specifically include all testing <br />required by the various sections of the Specifications. <br />The Contractor's quality control system is the means by which he assures himself that his <br />construction complies with the requirements of the Contract Documents. Controls shall be <br />adequate to cover all construction operations and shall be keyed to the proposed <br />' construction schedule. <br />END OF SECTION <br /> <br /> <br /> <br /> <br />LI <br />' 07/97 Section 01400 -Page 2 of 2 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.