i <br />1 <br />i <br />DIVISION 1 -GENERAL REQUIREMENTS <br />SECTION 01330 -SURVEY DATA <br />1.01 SURVEY REQUIREMENTS <br />A. Construction Stakeout: <br />1. Perform construction stakeout with qualified, competent personnel. <br />2. Engineer has established all temporary benchmarks as found on the Drawings. Base <br />all vertical measurements on established control. <br />3. Stake the slurry trench along its alignment at all beginning and ends of all curves <br />and at 50-foot stations. <br />4. Enter all survey notes and construction stakeout cut notes into bound, hard cover <br />field books furnished to Contractor by Engineer. <br />B. All survey data developed by Contractor in performing surveys required by the Work will be <br />available to the Engineer for examination throughout the construction period. <br />1.02 SUOMITTALS <br />A. Submit a copy of the cut sheets to Resident Project Representatives aminimum of 36 hours <br />in advance of construction activities so that lines and grades may be checked prior to <br />construction. <br />B. Submit to the Engineer all field books, notes, cut sheets and other data developed by the <br />Contractor in performing surveys along with other documentation required for Einal <br />Acceptance. <br />END OF SECTION <br />07!97 <br />Section 01330 -Page 1 of 1 <br />