Laserfiche WebLink
TABLE OF CONTENTS <br />' Tables <br /> Table 1 Calibrated Material Conductivity Values <br />' Table 2 Material Properties for Stability Analyses <br /> Table 3 Summary of Stability Analysis <br /> <br /> Figures <br />' Figure 1 Existing Dam Height Calibrated Phreatic Surface from Piezometric Readings <br /> Figwe 2 Existing Dam Height Phreatic Surface Following PMP Event (Base Case) <br />' Figwe 3 Existing Dam Height Phreatic Surface Following PMP Event (Base Case X 10) <br /> Figwe 4 Ultimate Dam Height Projected Phreatic Surface <br />' Figure 5 Ultimate Dam Height Phreatic Surface Following PMP Event (Base Case X 10) <br /> Figure 6 Ultimate Dam Height Post-Closwe Phreatic Surfaces <br />' Figure 7 Existing Dam Height Post-Seismic Stability Following PMP Event <br /> Figure 8 Existing Dam Height Static Undrained Stability Following PMP Event <br /> Figure 9 Ultimate Dam Height Post-Seismic Stability for Normal Operating Pond <br />' Conditions <br />Figure 10 Ultimate Dam Height Post-Seismic Stability Following PMP Event <br />' Figwe 11 Ultimate Dam Height Static Undrained Stability Following PMP Event <br />Figure 12 Ultimate Dam Height Post-Closwe Post-Seismic Stability after ] 0 years of <br />' Drawing Down the PMP Pool <br />Figure 13 Ultimate Dam Height Post-Closwe Static Undrained Stability after 10 years of <br />' Drawing Down the PMP Pool <br /> <br /> <br />1 <br /> <br /> <br />V+~ N.WROJECTS684Afi18 HENDERSON MILL BARGLSUB OD6.0 PROD DELIW1f.11LL R3.1%1017NUL-010 11 <br />