Laserfiche WebLink
SNOWCAP COAL COMPANY <br />Cameo Refuse Disposal Area No. 1 Inspection - 151 Quarter 2004 <br />On March 16, 2004, I performed the required quarterly visual inspection of the Cameo <br />Refuse Disposal Area No. 1 in accordance with Rule 4.10.2. <br />I, J. E. Stover, P.E., have a wide variety of experience in the design and construction of <br />earth fill embankments. Nothing was observed during the inspection that would indicate <br />the pile has a potential for failure. <br />The south under drain was damp to dry. The entire pile was dry including the terraces. <br />No seepage was noted around the pile. <br />The access road to the pile, which is the west extension of Haul Road No. 5, remains <br />open to accept coal and refuse material from other reclamation activities. <br />The northwest and southeast collection ditches were clear. <br />The pile is located in a remote area well away from human habitation. A failure of the <br />pile might damage the haul road and sediment pond located below the pile. However, <br />a failure of the pile would probably not be a hazard to human life. <br />I certify that to the best of my knowledge and belief, that the fill and other aspects of the <br />Cameo No. 1 refuse pile have been constructed as permitted in the design approved by <br />the DMG. •••p RFG°O• <br />~~~P~+~•oe•e S)' 9 <br />~, . <br />Recommended maintenance: None ;~~e~`` o~;.o; <br />;,;', James E. <br />;o,,''P.E. No.; <br />Y'FS '^e ea aaae <br />°»~dr9A. E~ <br />•asm/~ <br />