Laserfiche WebLink
Y <br />November 15, 1985 <br />Annual Report <br />File No. 81-85 <br />Borrow Area: "Riprap" <br />1) Location and number of acres affected: 10 acres (see map) <br />2) Location and number of acres reclaimed: 8 acres <br />3) Location and number of acres in various stages of reclamation: <br />0 Acres backfilled <br />8 Acres graded <br />8 Acres topsoil replaced <br />8 Acres revegetated <br />4) Species of vegetation planted; the location and approximate dates of <br />planting: See attached seed mixture list. Area reseeded last week <br />of September, 1985. <br />5) Type and quantity of fertilizers, organic material or soil <br />conditioners used and location of use: No fertilizer or compost <br />utilized. <br />6) Appraisal of success of reclamation efforts: Not Applicable. <br />7) Location and number of acres to be affected in the coming year: <br />Approximately 2 acres of the 10 acre area originally disturbed will <br />continue to be utilized in 1985-86. <br />Note: Municipal Subdistrict will utilize the working area of the <br />riprap quarry on an on-going basis to develop and stockpile <br />riprap for maintenance of the Windy Gap Project. <br /> <br />NOV 18 1985 <br />Co10.130~i. 0! Azei u~ ~ j'vuL:~ i L .:. <br />