My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP34803
DRMS
>
Back File Migration
>
Report
>
REP34803
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:11:47 AM
Creation date
11/27/2007 6:57:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981132
IBM Index Class Name
Report
Doc Date
11/15/1986
Doc Name
ANNUAL REPORT FEE MAP FOR PN M-81-132 VALCO INC LAMAR WEST PIT
From
VALCO
To
DNR
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />November 13, 1986 <br />~ iii iiiiiiiiiiiu iii , <br />VALCO, INC. <br />LAMAR CONCRETE DIVISION <br />P. 0. BOX 591 <br />LAMAR, COLORADO. 81052 <br />(303) 336-2223 <br />Mined Land Reclamation Division <br />Department of Natural Resources <br />State of Colorado <br />423 Centennial Building <br />Denver, Colorado 80203 <br />~~~~~ <br />~v 1 ~ ~F~ <br />?FC~M ~o ~1 ~oS <br />Hp~V~`4lO~~ <br />RE' ANNUAL REPORT, FEE, MAP FOR PERMIT M-81-132 4ALC0, INC.-LAMAR l•JEST PIT <br />Enclosed is our annual repor+_, map a^d fee for the above designated mining <br />operation for the 1985-86 period. <br />1. There wa.s no mining for the year. P!o acres affected. <br />2. No acres were reclaimed. <br />3. No additional reclamation has occured since our last report dated <br />November 18, 1985. <br />4. The vegetation cover on the slopes is from a natural process. We <br />do anticipate some mining for the 1986-87 year so de not plan to <br />plant any type of vegetation this cemi~g year. <br />5. No fertilizer, ornanic material or coil conditioners were Used. <br />6. The g mwth of the natural vegetation appears to be good due to <br />'the large amount of rainfall we received this fall. <br />7. Anticipated mining in 1986-87 would occur in phase 1 of our plan. <br />Affected acres would be between onP and three. <br />8. The effectad date of this information is November ].3. 1986. <br />Also, please accept this letter as our statement that because the affected <br />land was used for less than 180 days last year this does net constitute any <br />temporary cessation of mining. And should circumstances occur in 1986-87 <br />similar to the afore mention this also would not constitute any temporary <br />cessation of mining. <br />Please find a check enclosed in the amount of $350.00 for the Annual Fee. <br />Encl: 2 ~~~ ~ / <br />.~.~ <br />William R. Eisenmar <br />General Manager <br />VALCO, INC. <br />Lamar Concrete Division <br />i~l~y/~ <br />~.~- ~ <br />ROCKY FORD PUEBLO CANON CITY <br />~2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.