My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP34754
DRMS
>
Back File Migration
>
Report
>
REP34754
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:11:44 AM
Creation date
11/27/2007 6:56:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Report
Doc Date
4/29/1996
Doc Name
1995 ANNUAL SUBSIDENCE REPORT
Permit Index Doc Type
SUBSIDENCE REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 1995 Production and Geologic Conditions <br />Approximately 520,000 tons of coal was produced from the Mine in 1995 under <br />Federal Coal leases C-37210 and C-53356. Production was sustained during the <br />entire year. <br />Mining at the West Mine during 1995 entailed both panel advance development and <br />pillar retreat extraction. Panel zZ was developed to near the limit of the west <br />thick coal pod. Panel ZZ- 1 North was developed and then conditions outby the <br />section forced the min;ng operation to retreat from the panel. A small section <br />between Panel Z aryl Panel A A was developed and pillared. Roars were driven off <br />II West Sntm,;r,G but the coal quality was poor so this section was abandoned. <br />Panel X was advanced to what was believed to be the fault line. Roars were <br />developed off Panel X to develop 4 Right, 2 Right and 1 Right sections. See <br />Map No. 2-5 which presents the location of the mining performed during 1995. <br />Panel ZZ: <br />Mined Length: Panel ZZ was developed 1050-feet on advance in 1995. Only a <br />small portion of the panel was pillared. <br />Overburden Thickness: <br />Varying from 1,000 to 1,500 feet. <br />Mining Height: 9-11 feet on advance; 15-18 feet on retreat. <br />• Panel ZZ-1 North• <br />Mined Length: Approximately 1950 feet of panel advance development. Only <br />a small portion of the panel was pillazed. Conditions outby <br />the section forced the mining operation to retreat from the <br />panel. <br />Overburden Thickness: <br />Varying from approximately 1,000 to 1,500 feet. <br />Mining Height: 9-11 feet on advance. 15-18 feet on retreat. <br />Panel X <br />Mined Length: Approximately 2,050 feet of panel advance. <br />Overburden Thickness: <br />Varying frcm approximately 1,500 to 2,000 feet. <br />Mining Height: 9-11 feet on advance. 15-18 feet in retreat in pillared <br />areas. <br />r1 <br />J <br />
The URL can be used to link to this page
Your browser does not support the video tag.