<br />ANNUAL REPORT
<br />INSTRUCTIONS
<br />According t C.R.S. 34-3''-116(3), and C.R.S. 34-32.E-1 16(3)(x), on the anniversary date of the permit each year,
<br />the operator hall submit a report and a map showing the extent of current disturbances' to affected land.
<br />reclamation ccomplished to date and during the preceding year, new disturbances that are anticipated to occur
<br />during the u coming year, and reclamation that will be performed during the upcoming year. Please attach such
<br />a report and ap to inclosed annual report form. (An adequately labeled map that clearly delineates and includes
<br />the above el menu may suffice for a written report.)
<br />If your oper [ion is subject [o [he provisions of Temporary Cessation as defined in the Act and Rules, you must
<br />provide wit [he Annual Report the following information as required by 2 CCR 407-I, 407-4, and Rules
<br />1.13.7(1)(a)
<br />_ _ _~ _ _ _-(~A= t#~con9itten-of-thevperation aL theY-me of cessation;'
<br />(ii) what specific measures havz been and will be implemented to comply with reclamation,
<br />pe rmance standards and Environmental Protection Plan requirements, if they are part of your
<br />app oved application; and
<br />(iii) plans for resumption of mining operations.
<br />Please
<br />[he additional following information with your Annual Report, as applicable:
<br />(a) IPer the requirements of Z CCR 407-1, 407-4, and Rules 1.15(1), provide an updated statement
<br />reg ding the sufficiency of the value of the Financial Warranty, specifically:
<br />(I) Per the requirements of 2 CCR 407-1, 407-4, and Rules I.IS(I)(a), provide an updated
<br />statement regarding the sufficiency of the value of the financial warranty. Specifically,
<br />irrevocable letters of credit, Deeds of Tmst, and security agreements, self-insurance, salvage
<br />credit, and first priority liens on project related fixtures.
<br />(ii) Per [he requirements of 2 CCR 407-I, 407-4, and Rules 1.15(1 }(b), permits secured with a
<br />Deed of Trust or a Security Agreement, the operator shall submit an update, by a qualified
<br />independent appraiser, indicating any changes in propery value, and a statement summarizing
<br />any circumstances which may affect the adequacy of the Deed of Tmst, or Security Agreement,
<br />and the value of the property subject to either of these instruments.
<br />The report shall also provide proof [hat [here are no past-due property taxes. _
<br />(iii) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.7(3), permits secured with an
<br />Irrevocable Letter of Credit, the operator shall have the bank provide documentation in the form
<br />of a balance sheet, certified by a Certified Public Accountant, demonstrating that the
<br />Letter of Credit does not exceed ten percent (10%) of the bank's capital surplus accounts.
<br />(vi) Per the requirements of 2 CCR 407-], 407-4, and Rules 4.9.3(c), permits secured by a First
<br />Priority Lien on any fixtures and Equipment, the operator shall provide a report in sufficient
<br />detail to fully describe the condition, value, and location of all pledged fixtures
<br />and equipment.
<br />Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(I)(c), all monitoring information
<br />wired as par of the approved permit application, [o include the Environmental Protection Plan.
<br />°ase note that if you are not a Designated Mining Operation, you will not have an Environmental
<br />section Plan as part of your approved permit.)
<br />
|