Laserfiche WebLink
,: <br />Holcim <br />Ms. Barbara Chiappone <br />Division of Minerals and Geology <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />September 30, 2003 <br />RE: Boettcher Gypsum Quarry: Permit #M-1977-346 <br />Dear Ms. Chiappone <br />Phone 970 482 4065 <br />Fax 970 482 1363 <br />www.holcim.com/us <br />~ I r~vp or.-~: . <br />~tvi~G ~ <br />DCT 0 3 X003 <br />Di73,ian at C1linzrals and Geoloy; <br />Attached is the Annual Report and a check in the amount $688.00 for the Boettcher <br />Gypsum Quarry. The fee is for the reporting period October 10, 2002 to October 10, <br />2003. <br />There has not been any activity on this permit during 2003 the reporting period. <br />A copy of the financial warranty is attached as per the requirements of 2CCR 407-1, <br />407-4 and Rules 1.15(1) (a). The bond is for $38,000 which is sufficient for current <br />reclamation requirements. Holnam, Inc. changed its name to "Holcim (US) Inc on <br />December 12, 2001. The rider to the bond reflects this change. <br />If you require additional information or clarification please contact me at the above <br />address and or phone number, or by a-mail at Gordon.bentonC~holcim.com. <br />Yours ely,!,~/---- <br />~rf1i/C <br />ordon Benton, Project Manager <br />Attachments <br />cc: Kathy Shanteau <br />Todd Richards <br />Holcim (US) Inc. <br />Building C <br />4629 N. Overland Trail <br />P.O. Box 1548 <br />LaPorte, CO 80535 <br />Strength. Performance. Passion. <br />