My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP34538
DRMS
>
Back File Migration
>
Report
>
REP34538
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:11:29 AM
Creation date
11/27/2007 6:51:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977347
IBM Index Class Name
Report
Doc Date
10/8/2002
Doc Name
Annual Report
Permit Index Doc Type
Annual Fee / Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geology ~Holci m <br />Holcim (US) Inc. <br />Building A <br />4629 North Overland Trail <br />P.O. Box 1468 <br />LaPorte, CO 80535 <br />Phone 970 482 5600 <br />Fax 970 482 5608 <br />www.holcim.wm/us <br /> <br />OCT 0 8 2002 <br />Ms. Barbara Chiappone <br />Division of Minerals and Geology <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver. CO 80203 <br />October 4, 2002 <br />RE: Slab Canyon Limestone Quarry: Permit # M-1977-347 <br />Dear Ms. Chiappone <br />Givision of Minerals and Geology <br />Attached is the Annual Report and a check in the amount $688.00 for the Slab Canyon <br />Limestone Quarry. The fee is for the reporting period October 10, 2001 to October 10, 2002. <br />There has not been any activity at this site during the reporting period other than reclamation <br />monitoring. There currently are no plans to resume operations in the near future. <br />A copy of the letter of credit is attached as per the requirements of 2CCR 407-1, 407-4 and Rules <br />1.15(1)(a). The letter of credit is for $184,819 which is sufficient for current reclamation <br />requirements. Holnam, Inc. changed its name to "Holcim (US) Inc on December 12, 2001. The <br />amendment to the letter of credit reflects this change. <br />If you require additional information or clarification please contact me at the above address and or <br />phone number, or by a-mail at roy.stienmier@holcim.com. <br />Yours sincerely <br />~~~~~ <br />Roy L. tienmier <br />Chief Geologist <br />Attachments <br />cc: R. Moir <br />G. Benton <br />
The URL can be used to link to this page
Your browser does not support the video tag.