Laserfiche WebLink
SLOPE STABILITY <br />INTERIM INSPECTION REPORT <br />AREA Wadae Hiphwall drainace fill DATE 03/29/95 <br />TIME 2:00 p.m. by Dennis Jones WEATHER Cloudy, 30oF <br />1. Debris, organic matter coal, etc., present in fill One to two feet of snow on the <br />bottom of the nit. <br />2. General gradation and characteristics of material Reclamation in progress. East side of <br />pit has been regraded. Hiphwall (west side) has been partially reoraded and benched with <br />the overburden drill at the site. <br />3. Presence of water, surface and ground None visible. <br />4. Condition of underdrain (approx. current width, depth, and length), material gradation <br />and characteristic, compaction, presence of water N/A <br />5. General material movement None observed. <br />6. Proximity and treatment of seep points Spoil sprinc 1000 ft downaradient flowing at a <br />rate of approximately 30 apm (visual estimate). <br />7. Condition of slope fill surface (grading, cracks or sloughing, erosion, revegetation) <br />Partially covered with snow. <br />8. Recommendation Continued observation as the Eill is placed and the West Wadce Pit area <br />is graded and reclaimed. Differential settlement and erosion should be monitored and <br />repaired as necessary. <br />9. Accountability <br />I certify the preceding observations and comments to be true and accurate to the <br />best of my knowledge. <br />APR U 5 1995 <br />Date <br />