• Table 1.3-1
<br />Springs Water Monitoring Program'
<br /> Field Water Quality Data
<br />Station Parameters= Measurements iu Tables
<br />Springs Above the "F" Seam in the Nanh Fork Drainage Basin
<br />G-12 3 times per year Mnuallyr E-I, F-I
<br />G-14 (decreed Spring #7) 3 times per year Annually' E-2, F-2
<br />G-16 3 times per year Annually' E-3, F3
<br />G-22 (decreed Spring #3) 3 times per year Mnually' E-4, F-0
<br />G-24 (decreed Spring #8) 3 limes per year Mnually~ E-5, F•5
<br />G-26A 3 times per year Mnuallyr E-b, F-6
<br />G-26B 3 times per year Mnuall}~ E-7, F-7
<br />(20) G•28e 3 times per year Mnually~ E•8. F-8
<br />Springs in or Below the "F" Seam in the Nosh Fork Drainage Basin
<br />(1) Jumbo Spring and Pipeline 3 times per year Annually' E-9, F-9
<br />G-la 3 timcs per year Mnually' E•10, F-10
<br />G-20 3 times per year Annually' E-I1, F-I I
<br />CR-12 (decreed Spring #12) 3 Tunes per year Annually' E-12, F-I2
<br />"
<br />"
<br />•
<br />Resources above the
<br />Seam on the Jumbo Mountain area in the
<br />B
<br />NoM Fork Drainage Basin
<br />(3) Jumbo PL (Pipclinc) & Spring No. 5 (G•35 decrccd Spring # l8) 3 times per year Mnually' E-l3, F-l3
<br />(4) Jumbo Spring No. 7 Pond (G-36, decrccd Spring # I7) 3 times per year Annually' E-14, F-14
<br />(5) Wilcox Reservoir No. 1 (G-37, decreed Spring #16) 3 times pct year Mnually' E-I5, F-IS
<br />(b) Wilcox Reservoir (G-38, decreed Spring #14) 3 times per year Annually' E•Ib, F•16
<br />(7) Section 24 Spring No. 1 Pond (G-39) 3 times per year Annually E-17, F-17
<br />(8) Jumbo Spring No. 6 Pond (decreed Spring #20) 3 times per year Mnually' E-I8, F-I H
<br />(9) Raymond Wilcox Resmoir No. 2 (G-10, decrecd Spring #19) 3 times per year Mnuall}~ E-19, F•19
<br />(10) Culven Spring (G-1l) 3 times per year Mnually? E•2D, F-2D
<br />(1 I) Pond Nosh of Jumbo Mountain Spring No. 2 (G-12) 3 times per year Annually' E-21, F-21~
<br />(IS) Jumbo Spring No. 2 Pond (G-25, decreed Spring #22) 3 times per year Annually' E-22, F-22
<br />(16) Famswonh Pond (G-Ib) 3 times per year Mnually' E-23, F-23
<br />(17) G•30 3 times per year Mnually' E•24, F-24
<br />(18) Jumbo Spring No. 4 Pond (G-31, decreed Spring #23) 3 times per year Mnually' E-25, F-25
<br />(19) Pond N.W. JMB-9 Hole (G-17) 3 times per year Mnually' E-26, F-26
<br />' From permit C-80-007, pages 2.048 and 2.04.49, last revised August 1994, TR-71, Table 18, Water Quality Monitoring Program.
<br />' Field parameters for surface water include Bow, pH, conductivity, temperature.
<br />'Annual analyses during the second sampling period include laborarory analyses of pH, conductivity, total dissolved solids (TDS), total suspended
<br />solids (TSS), calcium, magnesium, sodium, SAR• hardness, bicarbonate, chloride, nitraWnitrite, phosphate (PO,' as P), sulfate, iron (total and
<br />dissolved), manganese (total and dissolved), aluminum (dissolved), arsenic (total recoverable), cadmium, coppcr, lead, mercury (total recovcrable),
<br />molybdenum, selcnium (total rccoverablc), and zinc. All parameters were analyzed for their dissolved form unless stated otherwise.
<br />1-3-I.tb1UHR-95.210 ()
<br />
|