My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1989-12-01_REPORT - M1986147
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1986147
>
1989-12-01_REPORT - M1986147
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 11:31:25 AM
Creation date
11/27/2007 6:47:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986147
IBM Index Class Name
Report
Doc Date
12/1/1989
Doc Name
Annual Fee/Report Notice
From
STERLING READY MIX CONCRETE CO
To
MLRB
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STERLING READY-MIX CONCRETE CO. 999 <br /> STERLING. COLORADO 80751 <br /> November 27 , 1989 RECEIVED <br /> Ms. Diana Heyer DEC 11989 <br /> Colorado Mined Land Reclamation Board MINE® LANL) <br /> 1313 Sherman Street Suite 215 RECLAMATION DIVISION <br /> Denver, Colorado 80203-2273 <br /> Dear Ms. Heyer <br /> Re : Anniversary Date : December 2 , 1989 <br /> Annual Report (110) <br /> MLR No. M-86-147 , Harley Pit I <br /> Our files indicate that the annual date for this Annual <br /> Report is December 2 , 1989. Mining began in this pit in September, <br /> 1987 . <br /> We will deal specifically with each of the Annual Report <br /> questions as outlined in Section 3 .2 (6) of the Rules and Regulations <br /> revised 11/88 . <br /> 3 .2 (6) <br /> (1) We continued to mine in the northeastern corner of the opera- <br /> tion where mining started last year, mining an additional 0 .97 <br /> acres ±. To date we have stripped 0.67 acres ± ( lite brown) <br /> and mined approximately 2 .26 acres (bark brown) . Please refer <br /> to the attached map. <br /> (2) No reclamation was required. <br /> (3) We will continue to mine from east to west in the area stripped <br /> over the past year. If things go as we expect we may disturb <br /> as much as 4 .00 acres ± in the next year. <br /> (4) No reclamation is required until the mining is complete. Rough <br /> grading of the side slopes is completed as mining progresses <br /> The effective date for information contained herein is November, <br /> 22 , 1989. Please sign below to indicate your receipt of this Annual <br /> Report, Annual Report map and annual fee and return one copy of <br /> the receipted report to Environment, Inc. in the enclosed envelope. <br /> RECEIPT <br /> RECEIVED this day of December, 1 , <br /> Annual Report, Map and Check # f m <br /> Sterling Ready Mix Concrete Co. , Inc. <br /> MINED LAND RECLAMATIO <br /> By <br />
The URL can be used to link to this page
Your browser does not support the video tag.