~.
<br />ANNUAL REPORT
<br />INSTRUCTIONS
<br />Accordin, to C.R.S. 34-33-I 1 Gi 3), and C R.S. 34-33.5-I 16(3)(x), on the anniversary date of the permit each year,
<br />the operator shall submit a report and a map showing [he extent of current disturbances to affected land,
<br />reclamation accomplished to date and during the preceding year, new disturbances that are anticipated in occur
<br />durine the upcoming year, and reclamation that will be performed during the upcoming year. Please attach such
<br />a report and map to enclosed annual report form. (An adequately labeled map that clearly delineates and includes
<br />the above elements may suffice lar a written report.)
<br />If your operation is subject to the provisions of Temporary Cessation as defined in the Act and Rules, you must
<br />provide with [he Annual Report the following information as required by 2 CCR 407-1, 407-4, and Rules
<br />I .l 3.7(1)(a):
<br />(I) the condition of the operation at the time of cessation:
<br />(ii) what specific measures have been and will be implemented to comply with reclamation,
<br />performance standards ;tnd Environmental Protection Platt requirements, if they are part of your
<br />approved application; and
<br />(iii) plans for resumption of mining operations.
<br />Please provide the additional following information with your Annual Report, as applit:able:
<br />(a) Per the requirements of '' CCR 407-I. 407-4, and Rules 1.15(1), provide an updated statement
<br />regarding the sufficiency of the value of the Financial Warrant}', specifically:
<br />(I) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1)(a), provide an updated
<br />statement regarding the sufficiency of the value of the financial warranty. Specifically,
<br />irrevocable letters of credit, Deeds of Trust, and security agreements, self-insurance, salvage
<br />credit, and first priority liens an project related fixtures.
<br />(ii) Per the requirements o(3 CCR 407-1, 407-4, and Rules 1.15(1)(b), permits secured with a
<br />Deep of Trust or a Security Agreement, the operator shall submit an update, by a qualified
<br />independent appraiser, indicating any changes in property value, and a statement summarizing
<br />any t ircumstances which may affect the adequacy of the Deed of Trust, or Security Agreement,
<br />and the value of the property subject to either of these instruments.
<br />The report sha!I also pro"ide proof that there are no past-due property taxes.
<br />(iii) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.7(3), permits secured with an
<br />Irrevocable Leuer of Credit, the operator shall have the bank provide documentation in the form
<br />of a balance sheet, certified by a Certified Public Accountant, demonstrating [hat the
<br />Leuer of Credit does not exceed ten percent (10%) of the bank's capital surplus accounts.
<br />(vil Per the requirements of 3CCR -107-I. -107-d, and Rules 4.9.;(c), permits secured by a First
<br />Priority Lien un arty lxtures and Eiluipmen[, the operator shall provide a report in sufficient
<br />detail to lolly describe the condition, value, and location of all pled~~ed fixtures
<br />and cyuipmcnl.
<br />(h) Per the re:µtiremen[s of 3 CCR 407-I, 407-4, and Rules I.15(1)(c), all monitoring information
<br />regmred as pan of the ;ymproved permit application, to include the Environmental Protection Plan.
<br />(Please note that tf you are not a Designated Mining Opcmtion, you will not have an Environmental
<br />Protection Pl:m as pan of your approved permit.)
<br />
|