My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP34186
DRMS
>
Back File Migration
>
Report
>
REP34186
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:10:59 AM
Creation date
11/27/2007 6:46:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Report
Doc Date
8/5/1994
Doc Name
REFUSE PILE CONSTRUCTION FOIDEL CREEK MINE C-82-056
From
DMG
To
TWENTYMILE COAL CO
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiuiiiiiiiiiiii <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmenl of Nyural Resources <br />1713 Sherman SL, Room 21 5 <br />Ucnver, Colorado 80203 <br />Phone (3031 8663567 <br />FA%:13031 83?-H 106 <br />August 5, 1994 <br />I~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Ray Romor <br />Gnvcrno~ <br />Mr. Rick Mills <br />Twentymile Coal Co. <br />29587 Routt Co. Rd. ~ 27 <br />Oak Creek, CO. 80467 <br />RE: Refuse Pile Construction, Foidel Creek Mine, ~C-82-056 <br />Dear Mr. Mills: <br />Ken Sa la:ar <br />Execw rve Dnector <br />Michael B Long <br />Div isio~ Dueaor <br />This letter responds to your correspondence of July 14, 1994 <br />concerning the request to delay construction of a permanent waste <br />pile at the Foidel Creek mine. <br />The Division approves the delay of construction of the approved 20 <br />million cubic yard permanent waste pile until the preparation plant <br />becomes operational with the following understanding; <br />* If for any reason the preparation plant is not constructed, <br />the construction of the currently approved pile will commence <br />immediately <br />* The total above-ground volume at any time in the low quality <br />coal pile will not exceed 700,000 tons <br />* A technical revision to construct the preparation plant be <br />submitted within the next 60 days <br />If you have questions or concerns, please call me. <br />Sincerely, <br />Ke t A. Gorham <br />Environmental Protection Specialist <br />
The URL can be used to link to this page
Your browser does not support the video tag.