Laserfiche WebLink
• ~ • <br />Mined Land Reclamation Board <br />February 11, 1983 <br />Page Two <br />April 1982 Shrubs Quantity °~ Loss <br />Caragana 100 40 <br />Lilac 50 55 <br />Sumac 50 85 <br />April 1982 Trees Quantity °r, Loss <br />Pondersoa Pine 100 100 <br />Russian Olive 100 20 <br />In addition to the trees and shrubs, we cleaned up and seeded <br />the bone yard (noted on map) with the following mix: <br />Smooth Brome at 6 lbs/acre <br />Pubescent Wheat Grass at 6 lbs/acre <br />Western Wheat at 6 lbs/acre <br />Russian Wild Rye at 6 lbs/acre <br />Yellow Sweet Clover at 2 lbs/acre <br />The above mix was broadcast in the fall. To date, it is <br />too early to access the results. <br />5. The type and approximate quantity of fertilizers, ~~rganic <br />material, or soil conditioners used and location o:E use: <br />no fertilizers, organic material or soil condition~:rs used. <br />6. An appraisal of the success of reclamation efforts, and in <br />the event of failure of any efforts, a short narra=ive on <br />the suspected or determined cause of such a failure=: the <br />success of the reclamation efforts can be found in paragraph <br />3 and 4. Any lack of success can be attributed to the <br />arid environment. The oncoming growing season wi1:L be the <br />crucial stage in last year's plantings. The succe:~s of <br />this reclamation will be reported in next year's annual <br />report. <br />7. Estimates of the location and number of acres affected in <br />the coming year: 104 acres. (Same as this year; p=_ease <br />note location on map.) <br />8. The effective date of the information provided sha:.l be no <br />more than 45 days prior to anniversary date: effective <br />date of information is February 10, 1983. <br />