My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP34005
DRMS
>
Back File Migration
>
Report
>
REP34005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:10:36 AM
Creation date
11/27/2007 6:42:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
4/21/1992
Doc Name
MEMO POTENTIAL SEEPAGE THROUGH TAILINGS IMPOUNDMENT LINER AT SAN LUIS PROJECT
From
MLRD
To
BRUCE HUMPHRIES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Memo to Bruce Humphries -2- April 21, 1942 <br />There is no leak detection system for the tailings impoundment. If an <br />unsaturated flow occurs which transmits contaminents to the water-table, the <br />first indications will be at the down-gradient monitoring wells. Long-term <br />monitoring of these wells is imperative, as it appears that a two-foot head on <br />the geo-membrane would result in an increase in sub-soil moisture content that <br />would lead to unsaturated flow to the water-table. As stated in my memorandum <br />dated April 14, 1992, a one-foot head on the liner should not result in <br />exceedence of the specific retention of the impoundment sub-soils and <br />subsequent unsaturated flow to the water-table. <br />ACS/bjw <br />Enclosure <br />2682E <br />
The URL can be used to link to this page
Your browser does not support the video tag.