My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP33900
DRMS
>
Back File Migration
>
Report
>
REP33900
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:10:17 AM
Creation date
11/27/2007 6:40:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
11/17/1993
Doc Name
BATTLE MOUNTAIN RESOURCES INC BMRI SAN LUIS PN M-88-112 TAILINGS AREA CONST ACTIVITIES WK NOV15 1993
From
BATTLE MOUNTAIN RESOURCES INC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ ~ ~ III IIIIIIIIIIIIIIII ~ <br />BATTLE NSOUNTAIN RESOURCES. INC <br />November 15, 1993 ~~~` <br />Mr. Larry Oehler ';Ol` 17 199j <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 c~ofioc"or~n~NNr <br />Re: Battle Mountain Resources, Inc. (BMRI) - San Lu1s <br />DMG Permit No. M-88-112 <br />Tailings Area Construction Activities <br />Week of November 15, 1993 <br />Dear Mr. Oehler: <br />During the week of November B, 1993, construction activities <br />were limited to placement of liner cover material along the <br />north side of the facility and stockpiling of liner cover <br />material in the borrow pit. <br />Doug Gibbs of Water, Waste, and Land (WWL) visited the site <br />on November 11; he inspected the placement of cover material <br />and observed screening activities in the borrow pit. He <br />also reviewed and received copies of correspondence between <br />BMRI and the Division pertaining to the construction <br />project. Apparently, WWL had not received recent <br />correspondence; we will be copying WWL on all construction <br />correspondence and updates. <br />Settlement marker information is enclosed. The markers <br />continue to be surveyed daily. <br />The following is a summary of construction activities for <br />the week of November 15, 1993: <br />-Continue stockpiling and placement of <br />on the north side of the facility. <br />-Prepare roadways for Caterpillar Model <br />embankment fill material. <br />-Resume construction activities for the <br />If you have any questions, please call. <br />Sincerely, <br />~Yonc.~ ~ ~~ <br />Alana L. Scott <br />Environmental Engineer <br />cc: Clint Strachan <br />Anne Baldrige <br />Ken Kluksdahl <br />Mike Young <br />liner cover material <br />777 hauling of <br />main embankment. <br />A SUflS/D(ARY Ot RATTLE hfOUMAhV GOLD COM11PAn'1' <br />P.O. BOX?IU SAN LUIS, COLORAW 8115?~U~IO (719)67?336'_ FAX(7I9)672-3363 <br />
The URL can be used to link to this page
Your browser does not support the video tag.