Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />TABLB 4 <br />FUTIIRE ANNQAL WATER ANALYSIS OF COAL PREPARATION PLANE <br />Inuut to Plant <br />1) 727.000 tone raw coal (15Z moisture) 80.2 acre-feet <br />2) Water delivered to Plant (consumptive use) 12.0 <br />Total 92.3 <br />Output of Plant <br />1) 500.000 tone clean coal (12Z moisture) 44.2 <br />2) 97.000 tone belt press mud (35.SZ moisture) 25.4 <br />3) 84.000 tone fine reface (27.75 moisture) 17.1 <br />4) 39.000 tone coarse refuse (12.2x moisture) 3.5 <br />5) 7.000 tone rotary breaker reject (9.OS moisture) 0.5 <br />6) Black Wa[er Pond evaporation (0.32) sad outside <br />vaebing uses (1,29) 1.6 <br />Total 92.3 acre-feet <br />- 21 - <br />