Laserfiche WebLink
WHITEWJ~R BUILDING MATERIALS~lRPOt` III IIIIIIIIIIIIIiiI <br />940 South 10th Street, P.O. Boa 1769 <br />GRAT~~~ 81502 <br />n SEP 19'1985 <br />SAND & GRAVEL PRODUCTS MINED LAND READY MIXED CONCRETE <br />Phone 24E-7537 RECLAMAYION DIVISION Phone 2{2.4843 <br />September 18, 1985 <br />Colorado Mined Land Reclamation Division <br />1313 Sherman Street, Room 423 <br />Denver, Colorado 80203 <br />Gentlemen: <br />Re: Annual Report, MLR File 77-129, Whitewater 500 Pit - Mesa County <br />Mining and reclamation continued according to the mining and <br />reclamation timetable submitted in the Technical Revision accepted <br />in 1981. An economic slowdown has been affecting the Grand Junction <br />area and product demand has been lower than anticipated. <br />Reference is made to MLRB Rules and Regulations, Section 2.40. <br />2.41 (1) No new land was disturbed in the last year. A minimal <br />amount of mining was carried out in areas previously <br />disturbed. Material used in operations came from <br />stockpiles accumulated in past years. Refer to the <br />1982-1983 annual report map. A revised map is not <br />being submitted because no additional disturbances <br />have occurred. <br />(2) Backfilling in Stage Y has stopped since no new area <br />has been disturbed to provide a source of backfill <br />material. No other stages require reclamation at this <br />time. <br />(3) Backfill of the 15 acres in Stage Y will resume as soon <br />as additional area is disturbed and material becomes <br />available. <br />(4) No planting was scheduled for this year. <br />(5) No fertilizing was called for this year. <br />(6) Monitoring has continued in the areas where <br />revegetation has been done in Stage X. <br />(7) As economic conditions steady, mining will continue in <br />Stages I and C with approximately 2.50 and 1.00 +/- <br />acres respectively being mined during the coming year. <br />SEP 19 ~g65 <br />MINED LAN V1S10N <br />aEGL~-MA?ION p <br />