Laserfiche WebLink
Site Reclamation Activity <br />. April 2002 - March 2003 <br />Page 9 <br />The seep ATS2, originally from the toe of the American Tunnel <br />waste dump, has maintained the level of improvement first seen <br />after completion of the waste dump reclamation. The seep ATS1 <br />appears to have disappeared or relocated due to the <br />reclamation of the waste dump. <br />3) Terry Tunnel/Lake Emma <br />Eureka Creek monitoring above the Terry Tunnel continues to <br />show the same level of improvement, as compared to previous <br />years. <br />- Settling, phreatic water levels and bulkhead <br />inspections <br />Included in Appendix A are settlement monitoring data for Tailings <br />Pond No.4 and phreatic water level monitoring for Tailings Pond <br />No.4. <br />Tailings Porid No.4 settling and phreatic level monitoring does not <br />reveal any ~idverse trends. The phreatic level remained low since <br />• pond reduction occurred. <br /> <br />