Laserfiche WebLink
i ! • <br />Peabody Western <br />Paradox Hydrology System <br />Water Quality Repor[ Remarks <br />Sample Sample <br />Date Time <br />_________ ___________ <br />Site: ySSF2 <br />8/10/99 1015 POND BEING REBUILT <br />9/27/99 1245 POND RECONSTRUCTION COMPLETE 9/13, LAST DATA FOR THIS SITE, REFER TO NPDE512 FOR ALL <br />FUTURE DATA. <br />C <br />Conditions Specified: From 10/01/98 To 9/30/99...SUAF <br />